



Sikigu Project Planner Notebook
Constructed with premium paper material, this notebook features glued pages that can be easily torn out. The compact format of 14.8 x 14.8 cm is perfect for any on-the-go note taking needs. With space for 20 months of notes, the notebook includes a month grid on one page and a vertical layout for 30 days with an hourly schedule on two pages. It is an ideal tool for organizing projects and tracking habits.
- 80 pages
- 14.8cm x 14.8cm
- Made in Japan
About Sikigu
Sikigu is a thoughtfully designed brand by Taisei Shiki Mfg., dedicated to redefining the role of paper in modern life. Rooted in the Japanese term âShiki-gu,â meaning âPaper-Tools,â Sikigu blends traditional craftsmanship with contemporary design to create functional, paper-based products for daily use.
View all Sikigu products we stock
Â
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Constructed with premium paper material, this notebook features glued pages that can be easily torn out. The compact format of 14.8 x 14.8 cm is perfect for any on-the-go note taking needs. With space for 20 months of notes, the notebook includes a month grid on one page and a vertical layout for 30 days with an hourly schedule on two pages. It is an ideal tool for organizing projects and tracking habits.
- 80 pages
- 14.8cm x 14.8cm
- Made in Japan
About Sikigu
Sikigu is a thoughtfully designed brand by Taisei Shiki Mfg., dedicated to redefining the role of paper in modern life. Rooted in the Japanese term âShiki-gu,â meaning âPaper-Tools,â Sikigu blends traditional craftsmanship with contemporary design to create functional, paper-based products for daily use.
View all Sikigu products we stock
Â
























